Elastic Networks 600 Especificações Página 152

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 238
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 151
3 BitStorm 1900 Maintenance Elastic Networks
3-130 BitStorm 1900 Installation and Maintenance Guide 08-01101-01, Rev. 1.50
End-to-end Maintenance Checklist
Table 3-2: End-to-end Maintenance Checklist
Problem Check
No voice or data service
Verify power at all points in the system
Verify connections and wiring condi-
tions at all points
Voice but no data service
Verify that there is not an external net-
work problem such as a server being
down
Verify that the Ethernet card on the PC
connected to the modem has been con-
figured
Verify that the correct type of Ethernet
cable (straight or crossover) is being
used for the application.
Verify that the green LEDs at the vari-
ous Ethernet connection points are lit
Check for 10Base-T cable damage
Verify router configuration and installa-
tion
See the checklist in Table 3-1, Voice/
Data Connectivity Maintenance in
Facility Room, on page 129.
Data but no voice service
Check dialtone at the PSTN/PBX cross-
connect to verify that there is not an
external voice network problem
Check/replace filter card in filter shelf
Vista de página 151
1 2 ... 147 148 149 150 151 152 153 154 155 156 157 ... 237 238

Comentários a estes Manuais

Sem comentários